Calculate cubic yards, bags needed, and Lewisville TX-accurate ready-mix costs for driveways, patios, garage slabs, post-tension foundations & footings across Denton County and the greater DFW Metroplex.

$140
Avg Lewisville Ready-Mix (per Cu Yd)
PT Slab
Foundation Standard — DFW Expansive Clay
10"
Frost Depth — Minimal, No Air Needed
106°F
Summer Highs — Early AM Pour Critical
🚗 Driveway 🏠 Garage Floor 🏗️ PT Foundation 🪨 Footings 🛤️ Patio / Slab 🌆 DFW Black Expansive Clay
The Lewisville Concrete Calculator helps homeowners, contractors, and builders across Lewisville, The Colony, Flower Mound, Carrollton, Coppell, Grapevine, and Denton County estimate cubic yards, bag count, and ready-mix costs for any DFW concrete project. Lewisville ready-mix runs $130–$168/yd — competitive DFW Metroplex pricing served by multiple North Texas batch plants. Lewisville's climate is a hot humid subtropical zone: brutal summers exceeding 106°F with heat indices over 110°F, and mild winters with occasional ice storms but minimal frost accumulation. Air entrainment is not required — Lewisville's 10-inch frost depth and rare freeze events don't warrant it for most projects. North DFW's most critical local factor is its Houston Black expansive clay (Vertisol) — one of the most shrink-swell soils in North America — which causes more concrete foundation movement and failure in Denton County than any other single factor. Post-tension (PT) slab foundations are the dominant residential foundation system in Lewisville specifically because of this expansive clay. Proper drainage, controlled moisture, and correct concrete design are non-negotiable in the DFW black clay zone. Enter your dimensions for instant, Lewisville-accurate results.

🌆 Lewisville Concrete Calculator

🌆 Denton County Pricing · Texas TBC/IBC · DFW Expansive Black Clay, PT Slabs & Summer Heat Guide
Lewisville Concrete Calculator
Cubic yards, bags & Lewisville TX ready-mix cost — instant results
🚗 Driveway 🏠 Garage 🏗️ PT Foundation 🪨 Footings 🛤️ Patio

Enter project dimensions to calculate volume, bags, and estimated Lewisville TX material cost.

Use 4–5 in. for driveways. 3,000–3,500 PSI is the Lewisville standard. No air entrainment needed. Probe moisture in black clay before any pour — never pour on dried, cracked, or over-wetted Vertisol. Slope all slabs 1% min. Schedule summer pours before 7 AM. Add set retarder May–Sep.

Patio 4 in · Sidewalk 4 in · Driveway 4–5 in · Garage 4 in · PT Slab 5–6 in (per PE design) · Footing / Pier: per structural engineer

Cubic Yards Required
—
Including waste factor

📋 Project Summary

    💵 Lewisville Cost Estimate

      📐 Lewisville Driveway & PT Slab Cross-Section — DFW / Denton County Standard Construction Layers

      Broom Finish — Required for Traction · No Sealer Needed (Dry TX Climate)
      Concrete — 4–5 in. (Driveways / Flatwork) · 5–6 in. PT Foundation (Per Engineer)
      3,500 PSI · No Air Entrainment · W/C ≤ 0.50 · Fiber Mesh or PT Cables
      🟡 Post-Tension Cables (Foundations) — Standard DFW Foundation System Over Expansive Clay
      🔵 Polypropylene Fiber Mesh (Flatwork) — Crack Control Over DFW Vertisol Clay Sub-Base
      🟩 6 mil Vapor Barrier — Moisture Control Over DFW Black Clay; Interior Slabs & PT Foundations
      🪨 4–6 in. Compacted Crushed Limestone / Flex Base — Standard DFW Sub-Base Over Expansive Clay
      ⚫ Houston Black Clay (Vertisol) — Most Expansive Soil in North America · Moisture-Condition Before Pour
      ⬜ Austin Chalk / Eagle Ford Shale — Underlying Bedrock; Variable Depth Across Denton County
      27
      Cu ft per cubic yard
      45
      80 lb bags per cu yd
      $140
      Avg Lewisville ready-mix / yd
      Concrete PT Cables Fiber Mesh Vapor Barrier Flex Base Black Clay Chalk/Shale

      Lewisville Concrete — Key Local Considerations

      🔵 Texas Building Code (TBC/IBC) — Lewisville / Denton County Concrete Requirements

      Residential flatwork minimum: 3,000 PSI · Lewisville standard: 3,500 PSI for driveways and exterior slabs · PT foundations: 4,000 PSI minimum per structural engineer design — PT cable layout and stressing per registered PE required · Frost depth: 10 in. — minimal; air entrainment NOT required in Lewisville · Drainage: All slabs must slope minimum 1% away from structures — DFW receives 38 in. rain/yr and pooling on black clay causes severe slab movement · Black clay: Moisture-condition subgrade to optimum water content before placing flex base; never pour on bone-dry cracked Vertisol or over-saturated clay · Summer heat: Add set retarder for all pours when temps exceed 90°F · W/C ratio: ≤ 0.50 for exterior surfaces. Verify all requirements with City of Lewisville Building Inspections before starting permitted work.

      🚗 Lewisville Driveway Concrete

      A standard 20×20 ft driveway at 4 inches needs ~4.9 cu yd. At Lewisville pricing ($135–$152/yd for 3,500 PSI), material runs $661–$745. The biggest Lewisville driveway mistakes are: pouring on bone-dry, cracked black clay in July (the clay shrinks 6–8% when dry and swells back on moisture, lifting the slab); and skipping the 4-inch compacted flex base layer. Always moisture-condition the Vertisol sub-base and install proper crushed limestone flex base before pouring any Lewisville driveway. Control joints every 8–10 ft are essential over DFW expansive clay.

      ⚫ Houston Black Expansive Clay — DFW's #1 Concrete Risk

      Lewisville and Denton County are underlain by Houston Black clay (Vertisol series) — a black, waxy, shrink-swell clay with a Plasticity Index of 30–60+ and a volume change potential of 6–10% between wet and dry states. This clay is the primary reason DFW leads the nation in residential foundation repairs annually. When this clay dries during Texas summers, it shrinks and pulls away from slabs — creating voids that cause slabs to crack, tilt, and settle. When it rewets from rain or irrigation, it swells and heaves slabs upward. Moisture management is the single most important concrete factor in Lewisville.

      🟡 Post-Tension Slabs — Why PT Is Standard in Lewisville

      Post-tension (PT) slab foundations dominate Lewisville residential construction because they are the most cost-effective system for managing DFW's extreme expansive clay. A PT slab uses high-strength steel tendons (cables) embedded in the concrete and tensioned to approximately 33,000 lbs after the concrete cures. This pre-compression holds the slab together as one rigid unit, resisting the differential movement caused by the expansive clay beneath it. PT slabs in Lewisville typically use 4,000 PSI concrete, 5–6 inch thickness, and PT cable layout designed by a registered Texas PE — never pour a PT foundation without a structural engineer's stamped design.

      ⚫ DFW Expansive Black Clay — Complete Lewisville Concrete Moisture Management Protocol

      Managing Houston Black clay moisture is the foundation of successful Lewisville concrete work. Follow this protocol for every project: (1) Pre-pour moisture conditioning: In summer (May–Sep), the Vertisol sub-base will be bone-dry and cracked — water the sub-base slowly over 3–5 days before excavation to bring it to optimum moisture content (approximately 20–25% water content). Never pour on dry, cracked Vertisol. (2) Sub-base: Place 4–6 inches of compacted Grade 1 crushed limestone or caliche flex base over the conditioned clay and compact to 95% Proctor — this distributes loads and insulates the clay from rapid moisture change. (3) Vapor barrier: 6 mil poly vapor barrier over the flex base for all interior slabs and foundations — this prevents moisture migration from below. (4) Control joints: For flatwork, saw-cut control joints to 1/4 of slab depth within 24 hours of pour at maximum 8–10 ft spacing in both directions — DFW black clay will try to crack the slab at random if you don't control where it relieves stress. (5) Post-pour moisture: For foundations and structural slabs, maintain uniform soil moisture around the perimeter permanently through consistent drip irrigation — the #1 cause of DFW foundation failure is drought-induced perimeter shrinkage. (6) Drainage: Grade all soil away from concrete edges at minimum 6 inches drop per 10 feet — pooling water rewets the clay unevenly, causing differential heave.

      How to Calculate Lewisville Concrete Volume

      📐 Lewisville Concrete Volume Formula

      Volume (cu ft) = Length (ft) × Width (ft) × [Depth (in) ÷ 12]
      Volume (cu yd) = Volume (cu ft) ÷ 27
      Order Qty = CEIL[ Volume (cu yd) × Waste Factor ]
      Example: 20 ft × 20 ft driveway × 4 in = 133.3 cu ft = 4.94 cu yd → Order 5.5 cu yd (+10%)
      PT Slab: 60 ft × 40 ft house × 5 in = 1,200 cu ft = 44.4 cu yd → Order 49 cu yd (+10%)

      🌡️ Lewisville Summer Heat Pour Protocol — DFW Extreme Heat Management

      Lewisville summers are among the most demanding concrete environments in the continental US outside of Phoenix. From May through September, ambient temperatures routinely exceed 95°F by mid-morning, with concrete surface temperatures reaching 130–145°F in direct sun. Rapid moisture evaporation causes plastic shrinkage cracking within minutes if unmanaged. Follow this Lewisville summer protocol for every warm-weather pour: (1) Schedule all pours to begin at or before 6:30–7:00 AM — aim to have all concrete placed, screeded, and bleed water evaporated before 10 AM; (2) specify set retarder for any pour over 3 cu yd in summer (+$8–$14/yd) — this buys critical working time in DFW heat; (3) order mix with chilled or ice water from your Lewisville ready-mix supplier in June–August (+$10–$16/yd) to reduce concrete temperature at placement; (4) wet all forms, sub-base, and tools with cool water immediately before the truck arrives; (5) apply evaporation retarder spray (Confilm or equivalent) across each freshly screeded section immediately — this is non-negotiable on Lewisville summer pours; (6) erect shade cloth or white poly tarps over large pours if the sun is direct; (7) apply curing compound within 20–30 minutes of final troweling on the entire surface — white-pigmented compound reduces heat absorption; (8) moist-cure for 7 days — in DFW summer heat, keep curing blankets wet at all times or use multiple coats of curing compound. Never add extra water to a hot summer mix on-site — it will cause drastic strength reduction and plastic shrinkage cracking.

      🟡 Post-Tension Foundation Concrete — What Lewisville Homeowners Must Know

      Post-tension slabs are the standard residential foundation in Lewisville and across the DFW Metroplex. When working around an existing PT slab or contracting a new one, these rules are critical: (1) Never core-drill, cut, or saw into a PT slab without a PE-certified PT layout drawing — cutting a PT cable under 33,000 lbs of tension causes the cable to retract explosively into the slab, sometimes shooting through the opposite edge. Many DFW homeowners and contractors have been seriously injured by this. Always obtain the original PT layout drawing from the builder or hire a GPR (ground-penetrating radar) cable location service before any concrete cutting on a PT slab. (2) New PT pours: specify 4,000 PSI concrete minimum; do not stress PT cables until the concrete reaches at least 3,000 PSI compressive strength (typically 3–5 days after pour in DFW summer heat, 5–7 days in winter); stressing must be performed by a certified PT contractor using calibrated hydraulic jacks per the PE design. (3) Curing PT slabs: wet-cure or curing compound for 7 days minimum before stressing — proper curing is essential for PT systems to achieve design strength.

      Lewisville Concrete Pricing — Current Reference

      Lewisville and Denton County are served by multiple ready-mix batch plants across the DFW Metroplex including facilities along I-35E, TX-121, and the Sam Rayburn Tollway. DFW is one of the most competitive ready-mix markets in the US — multiple large producers including TXI, CEMEX, Vulcan Materials, and regional independents serve the market, keeping prices at or below national averages for equivalent mixes. The Colony, Flower Mound, Carrollton, Coppell, and Grapevine carry identical pricing to Lewisville. Short-load fees of $85–$160 apply for orders under 5–7 cu yd.

      Mix Type / PSI Lewisville Price / Cu Yd National Avg Best For Air Entrained? TX Code
      3,000 PSI$130–$143$130–$148Patios, sidewalks, light residential flatworkNot NeededMin Compliant
      3,500 PSI — Lewisville Std.$136–$152$138–$158Driveways, garage floors, general exterior flatworkNot NeededRecommended
      4,000 PSI — PT Foundations$145–$160$148–$166PT slab foundations, grade beams, structuralNot NeededPT Standard
      4,500 PSI — Heavy Structural$156–$170$160–$175Commercial grade beams, heavy-load slabsNot NeededCompliant
      5,000 PSI — Commercial$164–$185$172–$190Commercial, tilt-up, industrial floorsAs SpecifiedCompliant
      Summer Chilled Mix Water+$10–$16/yd+$10–$18/ydAll pours when temps exceed 90°F (May–Sep)SeparateRecommended
      Set Retarder+$8–$14/yd+$8–$15/ydAll large pours above 85°F May–SepSeparateRecommended

      3,000 PSI

      Lewisville Price / Cu Yd$130–$143
      National Avg$130–$148
      Best ForPatios, sidewalks, light flatwork
      TX CodeMin Compliant

      3,500 PSI — Lewisville Standard

      Lewisville Price / Cu Yd$136–$152
      National Avg$138–$158
      Best ForDriveways, garage floors, exterior flatwork
      TX CodeRecommended

      4,000 PSI — PT Foundations

      Lewisville Price / Cu Yd$145–$160
      National Avg$148–$166
      Best ForPT slab foundations, grade beams
      TX CodePT Standard

      4,500 PSI — Heavy Structural

      Lewisville Price / Cu Yd$156–$170
      National Avg$160–$175
      Best ForCommercial grade beams, heavy loads
      TX CodeCompliant

      5,000 PSI — Commercial

      Lewisville Price / Cu Yd$164–$185
      National Avg$172–$190
      Best ForCommercial, tilt-up, industrial floors
      TX CodeCompliant

      Summer Chilled Mix Water

      Cost per Cu Yd+$10–$16/yd
      Use WhenAll pours above 90°F (May–Sep)
      TX CodeRecommended

      Set Retarder

      Cost per Cu Yd+$8–$14/yd
      Use WhenLarge pours above 85°F (May–Sep)
      TX CodeRecommended

      Lewisville Concrete Calculator — FAQ

      How much does concrete cost per yard in Lewisville, Texas?+
      Lewisville ready-mix runs $130–$185/yd depending on PSI and admixtures. The residential exterior standard — 3,500 PSI — costs $136–$152/yd. For PT foundations, 4,000 PSI runs $145–$160/yd. Short-load fees of $85–$160 apply for orders under 5–7 cu yd. Summer chilled mix water adds $10–$16/yd from May through September. Set retarder adds $8–$14/yd for large pours when temps exceed 85°F. The DFW Metroplex is one of the most competitive ready-mix markets in the US — pricing is generally at or below national averages due to multiple large producers competing for market share.
      Why do so many Lewisville homes have post-tension slab foundations?+
      Post-tension slabs dominate Lewisville and DFW residential construction because Houston Black expansive clay (Vertisol) causes extreme seasonal volume changes that destroy conventional slab-on-grade foundations. A conventional slab over DFW clay will crack and tilt as the clay shrinks in summer and heaves in winter. A post-tension slab counters this by placing the entire slab in compression — the PT cables (tensioned to ~33,000 lbs each) hold the concrete together as one stiff unit that can ride out clay movement without cracking. PT slabs are not foolproof — perimeter moisture management remains essential even with PT construction — but they dramatically outperform conventional slabs on DFW expansive clay and have become the near-universal standard for Lewisville new construction since the 1980s.
      Is air-entrained concrete required in Lewisville, TX?+
      No — air entrainment is not required or recommended in Lewisville for standard flatwork. With a frost depth of only 10 inches and fewer than 5–10 meaningful freeze-thaw cycles per year, Lewisville falls into ACI 318's "Negligible" freeze-thaw exposure category. Air entrainment reduces concrete strength (approximately 200–300 PSI per 1% air) and is an unnecessary cost and quality reduction for Lewisville concrete. Standard 3,000–4,000 PSI concrete without air entrainment is the correct specification for all Lewisville residential and commercial concrete. If a contractor recommends air entrainment for a Lewisville flatwork project without a specific technical justification, question the recommendation.
      How do I protect a Lewisville concrete driveway from cracking over black clay?+
      Protecting Lewisville driveways from cracking over Houston Black clay requires attention across three phases: Before pour: moisture-condition the clay sub-base over 3–5 days to optimum water content; install 4–6 inches of compacted crushed limestone flex base; place 6 mil vapor barrier. During pour: add fiber mesh to the mix; specify 3,500 PSI; pour in the early morning; use set retarder May–Sep; apply evaporation retarder spray immediately after screeding. After pour: saw-cut control joints to 1-inch depth within 24 hours at maximum 8–10 ft spacing in both directions; apply curing compound; maintain consistent soil moisture along driveway edges with drip irrigation during drought periods. The single most effective long-term practice is consistent perimeter moisture maintenance — DFW driveways that are regularly watered around their edges during dry months outlast those that are not by decades.
      Can I pour concrete in Lewisville in the summer?+
      Yes — with strict protocols. Lewisville contractors pour year-round, including in peak summer, using these practices: (1) schedule pours to begin by 6:30–7:00 AM at the latest; (2) order chilled mix water or ice-cooled mix (+$10–$16/yd) for June–August pours; (3) add set retarder to all pours over 3 cu yd when temp exceeds 85°F (+$8–$14/yd); (4) wet all forms, sub-base, and tools with cool water immediately before truck arrives; (5) apply evaporation retarder spray section-by-section immediately after screeding; (6) never add water to the mix at the site to improve workability in heat — use a superplasticizer (water reducer) instead if additional workability is needed; (7) apply curing compound within 20 minutes of final troweling. With proper management, Lewisville summer pours produce excellent results — most experienced DFW concrete contractors prefer early summer to winter because there is no cold-weather management needed.
      Do I need a permit for concrete work in Lewisville, Texas?+
      Yes — the City of Lewisville requires permits for foundations, driveways connecting to public streets, retaining walls over 4 feet, and all structural concrete work. Apply through the City of Lewisville Building Inspections Department. PT foundation pours require a structural engineer's stamped design as part of the permit application. Lewisville Building Inspections performs mandatory pre-pour foundation inspections to verify sub-base preparation, PT cable placement, and rebar layout before any concrete is placed. Small decorative patios not adjacent to or draining toward the structure may be exempt below a threshold — confirm with the Building Inspections Department before starting work. All Texas contractors performing structural concrete must hold a valid Texas contractor license.
      What is the difference between Houston Black clay and regular clay soil?+
      Houston Black clay is classified as a Vertisol — the most expansive soil order in the USDA classification system. It differs from ordinary clay in several key ways: (1) Extreme shrink-swell: Houston Black clay shrinks up to 10% in volume when dry and swells the same amount when wet — most ordinary clays shrink and swell 2–4%. (2) High Plasticity Index: PI of 30–60+ vs. 10–20 for typical clays, meaning it deforms easily under load. (3) Depth: Houston Black Vertisols in Denton County extend to 3–5 feet deep — it's not just a surface issue. (4) Self-mulching: Dried Vertisol develops deep shrinkage cracks (gilgai microrelief) that can be 1–2 inches wide and 12–18 inches deep in extreme drought — these provide direct pathways for moisture to penetrate deeply and unevenly, causing severe differential swell when rain returns. This is why foundation engineers, geotechnical engineers, and concrete contractors in Lewisville treat DFW black clay as a completely different engineering challenge from conventional soil conditions.

      Official Lewisville Concrete Resources

      City of Lewisville permits, Texas Building Code, PT foundation standards, and DFW black clay soil guidance for Denton County concrete projects.

      🏛️

      City of Lewisville — Building Inspections

      Permits & Inspections

      Apply for City of Lewisville building permits for driveways, PT foundations, retaining walls, and all structural concrete work. Building Inspections enforces the Texas Building Code and performs mandatory pre-pour inspections for PT slab foundations, verifying sub-base preparation, PT cable layout, and vapor barrier placement before any concrete is placed. PT foundation permits require a stamped structural engineering design as part of the permit application. Verify that your concrete contractor holds a valid Texas contractor registration before signing any structural concrete contract in Lewisville.

      Visit Lewisville Building Inspections
      🏗️

      Texas Dept. of Licensing & Regulation

      TX Contractor Licensing

      The Texas Department of Licensing and Regulation (TDLR) licenses and regulates residential contractors in Texas. Before hiring any Lewisville concrete contractor for structural work — particularly post-tension foundations — verify their registration and license status through TDLR's online license lookup. Texas also requires that all PT slab designs be stamped by a registered Professional Engineer (PE) licensed in Texas. TDLR also administers the Texas Residential Construction Commission standards that govern foundation construction warranties and dispute resolution for Denton County homeowners.

      Visit TDLR Texas
      ⚫

      USDA NRCS — Denton County Soils (Vertisol / Black Clay)

      Soil & Clay Data

      The USDA Natural Resources Conservation Service (NRCS) Web Soil Survey provides detailed soil mapping for every parcel in Denton County, including Houston Black Vertisol extent, Plasticity Index ratings, shrink-swell potential classifications, and engineering properties. Use the Web Soil Survey to confirm whether your specific Lewisville lot is mapped as high-swell Vertisol or lower-risk alluvial soils near Lewisville Lake and the Elm Fork Trinity River. Understanding your lot's specific clay profile helps size sub-base requirements, plan moisture management, and determine whether a geotechnical investigation is warranted before PT foundation design and pour.